Requires Android: 1.5 and up
Overview: Experience the best in retro gaming with Dragon’s Lair on your Android device!
Now you can experience the best in retro gaming on-the-go with Dragon’s Lair on your Android device! Both the phone and tablet editions included for one low price!
Immerse yourself in the visually stunning world of hand-drawn animation adapted from the original smash hit arcade classic. Transferred from the original high definition master film, you’ll experience this fully arcade authentic experience right in the palm of your hand.
Simply press on the direction pad to guide our hero Dirk The Daring in the correct direction. Use your sword to take on all that the Evil Wizard Mordroc throws your way.
This version of Don Bluth’s Dragon’s Lair is fully compatible with Android 1.6 through to the current release. In fact we’ve included fullcompatibility for phones and tablets! We’ve even remastered the footage for a variety of screen resolutions so all devices can experience Dragon’s Lair in all its glory.
Please note that we recommend you utilizing Wi-Fi connection to download Dragon’s Lair. Though downloading the full game may take some time after the initial download, you’re in for an awesome retro gaming experience.
Enjoy!
Dragon’s Lair is XPERIA PLAY Optimized.
————–
Discover all that Digital Leisure Offers:
Web: http://www.digitalleisure.com/android/games/
Facebook: http://www.facebook.com/DigitalLeisure
Twitter: http://www.twitter.com/digitalleisure
V1.052 update:
- Minor adjustments when game paused.
- Minor adjustments to XPERIA PLAY implementation.
- Compatibility Mode maintains touch overlays — try this if you find they disappear.
- Wii remote supported for button input. See http://goo.gl/vn2Dl (includes config file for Dragon’s Lair)
- iCade supported via keyboard mapping: W=Up, X=Down, A=Left, D=Right, U=Sword.






0 comments:
Post a Comment
# Adidasi si Haine Online
# Haine & Adidasi de Firma Pret Mic !
# Livrare in 24 ore - Comandati Acum
Click Aici !
____________________________________
Regulament Postare
1. Este interzisa publicarea oricarui link sau oricarei trimiteri catre alte siteuri, cu exceptia celor ale HacKRomania.blogspot.
2. Nu este permisa postarea adreselor de email sau de messenger.
3. Va rugam sa folositi un limbaj decent si un comportament adecvat.